IT SWAT

  • Turn around troubled and high-risk projects
  • Ship complex products under tight deadlines
  • Take full ownership of the outcome

Rapid engineering task force for critical and high-complexity challenges

$150/h

Call in IT SWAT

Missions completed

RUBRIK

Russian manufacturer of construction kits and collectible sets

Within two months, we built a working prototype of an educational robot. We handled the electronics, firmware, mobile app, admin panel, and voice recognition.

The product is now moving into production.

JUKTE.KZ

Kazakhstan-based freight logistics platform

Within two months, we designed, built, and launched an enterprise platform: web portals, a driver app, backend services, electronic document workflows with digital signatures, and external integrations.

As requirements shifted, we turned evolving business needs into clear product decisions.

Core IT SWAT team

Serik Beisenov

20 years in the industry. Rose from QA engineer to Head of Quality at Luxoft. Designs enterprise systems, builds AI-powered products, and owns mission delivery

SerikBeisenov

  • Enterprise
  • System Architecture
  • Delivery

Head of IT SWAT, CTO of Effective

Konstantin Doronin

17 years in the industry. Expert in AI engineering and agentic workflows. Over 250 projects across US, Europe, and Asia: from early-stage startups to factories, enterprise, and public sector

KonstantinDoronin

  • AI Engineering
  • Multi-Agent Systems
  • R&D

Engineer and tech lead

Arseniy Savin

Full-cycle engineer with experience on Yandex, Yango, and Mokka projects. Builds AI-powered solutions, designs high-load architecture, and ships services into production

ArseniySavin

  • High-load Backend
  • AppSec & Hardening
  • AI Products

Engineer and tech lead at Effective

Vladimir Gladkov

40 years of experience in electronics engineering. Design engineer: develops controllers, microelectronics, and takes hardware systems into production

VladimirGladkov

  • Electronics
  • Embedded
  • Hardware Design

Hardware design engineer

Bring in IT SWAT when

The launch date is at risk

You need a result by a fixed date, but the project lacks the specialists required to handle critical work

The project has stalled

Deadlines have slipped, the team is stuck, and the technical decisions no longer hold together

You need to digitize fast

A key business process needs an app, customer portal, integrations, or internal system within a short timeframe

Too much is still unknown

Requirements keep changing, but technical decisions can’t wait

We step in fast and get it done

Call in IT SWAT

One mission. Clear scope

You work directly with the head of the SWAT team from start to finish

Team

The SWAT lead works alongside one or two specialists selected for the task

Rambo

If the mission calls for a single specialist, the SWAT lead runs and delivers it personally

Before kickoff, we agree on the task, definition of done, and scope. Anything beyond that becomes a follow-up or a separate mission.

Let’s discuss your project

Serik Beisenov

Serik Beisenov

Head of IT SWAT, CTO of Effective

Message Serik on Telegram

The essentials